References: 12th International Multidisciplinary Scientific GeoConference, www.sgem.org, SGEM2012 Conference Proceedings/ ISSN 1314-2704, June 17-23, 2012, Vol. 1, 465 - 472 pp

ABSTRACT

Flotation tailings resulting in the production process of copper mining on the „Veliki
Krivelj“ is disposed in the tailing dump, which was established in the valley of the
Krivelj river. To regulate the Krivelj river flow in the tailings area, was built the
collector length of 2075 m. Due to the variations of designs, the collector has suffered
serious damage, which requires constant monitoring of his condition.
This paper describes the current state of collector under the flotation tailing dump
„Veliki Krivelj“, based on monitoring program auscultation between June and
December 2011. In the same period was performed, and monitoring water quality and
air pollution at the site of flotation tailings „Veliki Krivelj“ whose results are also
presented.

Keywords: auscultation, monitoring, collector of the Krivelj river, flotation tailing
dump „Veliki Krivelj“.