ESTIMATION OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING TUNNEL EXCAVATION
5th International Scientific Conference - SGEM2005, www.sgem.org, SGEM2005 Conference Proceedings/ ISBN: 954-918181-2, June 13-17, 2005, 273- 280pp
ABSTRACT
“The Black Sea Coastal Way Rehabilitation Project” which started seven years ago in
order to relief in traffic flow in the Eastern Black Sea Region of Turkey and presently
continues to complete their constructions. The project involves the rehabilitation and
shortening of the present motorway and hence the construction of new tunnels and riprap
material for filling the sea are required in some places. This paper involves one of the blast
based tunnel excavations, which is performed for “Yoroz Tunnel” situated in Trabzon in
north-east Turkey and presents the results of ground vibration measurements induced by
blasting.
Within the scope of the study, ground vibration components were measured using
vibration monitor at different locations for blast events during the advancement of about 260
meters length of the tunnel. The tunnel is in a residential part of the region. There are some
houses on the top and some 70 meters close to the surrounding tunnel. The local residents
complaints about the ground vibration, air-shock and noise from the tunnel blasts. A total of
32 blast events measurements were made for the estimation of the peak particle velocity and
to determine the slope of the attenuation curve together with the maximum charge per delay
for the test site. At the end of the statistical analysis of the data pairs, a final relation was
developed between peak particle velocity and scaled distance in terms of geological factors.
Finally, experiences gained during the blast based tunneling and the accumulated
information presented here are believed to be useful and reliable for a successful tunnel
excavation in similar formations.
PAPER 2005/s20.5: ESTIMATION OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING TUNNEL EXCAVATION
20 EURO ADD TO CART
Your cart ( items)
Tax cost ():
Shipping cost:
Total:
Libadmin2005
Articles by this author
- TWELVE METHODOLOGICAL PROBLEMS WITH THE AUTOMATION OF MANAGEMENT OF WORKING IN OPEN MINES
- POSSIBILITIES FOR ECONOMIC VALORIZATION OF SMALL COAL DEPOSITS IN THE REPUBLIC OF MACEDONIA
- AN INVESTIGATION OF THE STRENGTH AND DEFORMATION PROPERTIES OF PASTE BACKFILL MIXTURES
- THE APPLICATION OF HIGH DENSITY PASTE BACKFILL AT AN UNDERGROUND MINE
- AIMING TO THE PERFECT BLASTING RESULT REALITY OR JUST A UTOPIA? FACTS, PARAMETERS AND THOUGHTS BASED ON TWO CASE HISTORIES FROM EGNATIA ODOS – RING ROAD OF SALONICA SECTION, IN NORTHERN HELLAS
- [...]
en
ECOLOGY AND ENVIRONMENTAL PROTECTION
Papers SGEM2005 ?

© Copyright 2001 International Multidisciplinary Scientific GeoConference & EXPO SGEM. All Rights Reserved.